Yes. The Atmos Totnes Process has achieved Planning Permission for the site through a Made Community Right to Build Order, which was won through a thorough and innovative community consultation process leading to a referendum. A comprehensive phasing plan has been drawn up and the design team have all the technical design, engineering drawings and supply chain ready to start building in accordance with the strict licensing and phasing that exists on the site.